| |||||||||
![]() | | ||||||||
| |||||||||||||||
| |||||||||||||||
| Meridian Systems Welcome to the Nortel Meridian Forums Including Meridian Options 11-81C CS1000M Meridian Mail Call Pilot Companion and Sucession Hospitality OTM MAT MICB RAN NetGateway ..., and all other Applications |
| Tags: 11c, down, option, power, safe |
![]() |
| | LinkBack | Thread Tools | Display Modes |
| | #1 (permalink) | ||||||||
| Junior Member ![]()
Rep Power: 7 ![]() | I have an Option 11C - 3 CABs and I need to install a UPS Unit, the batteries that came with the unit are not enough to protect the switch when it keeps getting hit with power surges from the generator kicking in. I know there must be; however, I don't know what the proper procedure is for powering down the Voice Mail and Power to the switch. Can someone point me to some documentation or any feedback in this matter? Thank You | ||||||||
| | |
![]() |
| Currently Active Users Viewing This Thread: 1 (0 members and 1 guests) | |
| Thread Tools | |
| Display Modes | |
| |
Similar Threads | ||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| Option 11c Maintenance Terminal - Revisited | dppnwspec | Meridian Systems | 6 | 02-21-2003 03:27 PM |
| Option 11c tied to 61c | MrClean61 | Meridian Systems | 2 | 02-06-2003 03:52 PM |
| Purchasing an Option 11C How do you know? | morpheus | Meridian Systems | 18 | 12-20-2002 12:28 PM |
| DIG ringing option | switch | Meridian Systems | 3 | 12-17-2002 03:24 PM |
| Option 11C Power Requirements | morpheus | Meridian Systems | 3 | 12-16-2002 03:51 PM |