Location: Valparaiso Rep Power: 0 ![]() | Drol Hi, i am wondering something...why the DROL are always programed at midnight???? how much time it takes? can i use the phone while DROL are running?? I am learnig abuout meridian 1, but sometimes, when i am looking for something in the NTP's, i feel lost. | ||||||||
| | |
| | #2 (permalink) | ||||||||
| Senior Member
Location: Olympia, WA Rep Power: 4 ![]() | You want sub routines to run at a low peak hour. Midnight is just a time when most systems are at idle, but not always the case. It takes sometimes 15-30 minutes? And yes you can use the phone while the routines are running, but you don't want your routines running at a high peak hour. Hope that helps? | ||||||||
| | |
| | #3 (permalink) | ||||||||
| Junior Member
Location: Valparaiso Rep Power: 0 ![]() | Thank you...... but i have more questions... what could be the problem if i am runnung the DROL rutines at a high peak hour???. i am wondering if i can make the DROL 30 wherever i want, just for one time, not like a rutine, is there a way to do that? | ||||||||
| | |
| | #4 (permalink) | ||||||||
| Junior Member
Location: Sydney Rep Power: 2 ![]() | DROL can do a number of tasks. The biggies time wise are the data backup and the switch tests. Heres the deal.... If you have a multinode succession, then the back up happens on each of the media gateways. result is that they can be very time consuming. (i have seen up to 30 mins for the backup) If, for example you have an 81c, with a lot of IPEs then the switch test takes time....I have seen 40 mins plus. The result is that when you have reasonably intense backgrounds running, it can be to the detriment of what you really need..... call processing. You cannot as far as I know you cannot break DROL into single sub routines..... face it DROL = Daily Routine Overlays. Only option I can think of that does things in the background through the day are the BGND tasks set in LD 17 OVLY. Thing is though, its potentially moving things from low traffic (midnight) to business hrs etc. Probably not a good thing Oz | ||||||||
| | |
| | #5 (permalink) | ||||||||
| Senior Member
Location: Chicago -- CENTER OF THE UNIVERSE Rep Power: 10 ![]() | The switch will always prioritize call processing over other tasks, although if you suck the life out of the proccessors during a traffic period and then strat running maintenace routine you run the risk of the processors saying too much is going on and killing all process and performing an ini and or sysload that will effect callers. NOT A GOOD THING!!! Especially during the day the boss will NOT be happy with you. You can run any of the DROL routines individually. Look thru your maintenace NTP's. Depending on what your trying to do yes LD 30 can be run during the day, but use with caution. If your troubleshooting a problem at least get it down to a loop and or shelf level rather than running a system wide test. If your just running routines to learn what they do best to do off hours and or during a pre cleared maintenace window. Be sure that you know how to recover from anything you cause though. __________________ Dogs rollover Phones hunt | ||||||||
| | |
![]() |
| Currently Active Users Viewing This Thread: 1 (0 members and 1 guests) | |
| Thread Tools | |
| Display Modes | |
| |
Similar Threads | ||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| DROL testing causing T1 errors? | mpeterson | Meridian Systems | 6 | 07-10-2007 05:33 PM |
| DROL back from the dead | Catalytic_Avatar | Meridian Systems | 2 | 08-04-2005 07:43 PM |