| |||||||||
![]() | | ||||||||
| |||||||||||||||
| |||||||||||||||
| Meridian Systems Welcome to the Nortel Meridian Forums Including Meridian Options 11-81C CS1000M Meridian Mail Call Pilot Companion and Sucession Hospitality OTM MAT MICB RAN NetGateway ..., and all other Applications |
| Tags: estate, mermail, real, reclaimed, shelf, useful |
![]() |
| | LinkBack | Thread Tools | Display Modes |
| | #1 (permalink) | ||||||||
| Senior Member ![]() WhereWolf is sober (maybe....)
Rep Power: 4 ![]() | I just completed the removal of the retired MerMail shelf and replaced it with a regular IPE. In total actual work is about 1 hour working alone. Refurb ~ $1300 including I/O cables, PS, Ring Gen & Cont4. Already had the SUPL. Just need the tails when I get around to it. Peace of Mind Wherewolf | ||||||||
| | |
| | #3 (permalink) | ||||||||
| Senior Member ![]() WhereWolf is sober (maybe....)
Rep Power: 4 ![]() | Jest hooked some'ole chain roun' the bumper of my truck, putt'er in 4Low and drug 'er outta there. ![]() In reality, it's 5 ea 1/4" screws, plus the 8 screws on the front 2 vertical covers on the Circuit Breakers and the right side of the shelf. Unhook the cables & Ground and viola! slide'r on out. Went really well. I did cut power to the column, as per the NTP, however I don't see why that was required since the shelf power is in Parallel and you don't remove the vertical power feed between shelves. Oh well....better safe than smokin' ![]() | ||||||||
| | |
![]() |
| Currently Active Users Viewing This Thread: 1 (0 members and 1 guests) | |
| Thread Tools | |
| Display Modes | |
| |
Similar Threads | ||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| Mermail and Hotel Property Management System Not Talking. | hhallett | Meridian Systems | 10 | 11-14-2004 12:02 AM |