Home         |        Forums         |        Portals          |           Login               |     Register              
 
Go Back   VoIP / PBX Info Forum for Avaya / Nortel, Cisco, ShoreTel, Panasonic and other manufactuers Tech Tips Community > PBX / IP PBX FORUMS > AVAYA > Definity, S87xx, CM
   SEARCH  
     
User Name Password      
Save ?
Definity, S87xx, CM Definity Servers Support

Tags: , ,

Avaya Call Accounting, Hotel Billing, Telephone Reporting, Avaya Compliant Solutions

Reply
 
LinkBack Thread Tools Display Modes
Old April 8th, 2003   #1 (permalink)
Junior Member

Activity Longevity
1/20 19/20
Today Posts
0/0 ssssssss6
Rep Power: 0LittleGremlin is on a distinguished road
Gender:
Country:
Cannot release phone

Is there any way to setup a holiday schedule in vectors?
We have a Definity G3si r8.
LittleGremlin is offline   sendpm.gif Reply With Quote
Old April 9th, 2003   #2 (permalink)
Junior Member

Activity Longevity
0/20 20/20
Today Posts
0/0 sssssss78
Location: Chicago area (Lombard)
Rep Power: 82wire is on a distinguished road
Country:
Message Waiting Voltage

Not that I have found. We add an addtional line in the vector to skip all the steps and go directly to the 'we are closed' message.

An option to this if you have the DSA software or ASA, is that you can put a change into your vectors to add that line on certain days and then remove that line after the holiday. The DSA software allows you to schedule changes in advance, the only problem is you will need to leave your terminal on and connected to the switch, hopefully you can do this in a secure area.

I hope this helps.
2wire is offline   sendpm.gif Reply With Quote
Old April 10th, 2003   #3 (permalink)
Junior Member

Activity Longevity
0/20 20/20
Today Posts
0/0 ssssss583
Location: Tolland, CT
Rep Power: 8sjforcum is on a distinguished road
Auto-Answering Phone

I'm not sure which version (I'm on lowly 6 ) but Holiday routing was added. I would assume it ties into vectoring similar to the Vector routing tables.
__________________
Moderator - Avaya / Lucent Definity Boards
sjforcum is offline   sendpm.gif Reply With Quote
Old April 14th, 2003   #4 (permalink)
Junior Member

Activity Longevity
0/20 20/20
Today Posts
0/0 ssssssss2
Location: Bethesda
Rep Power: 0marketsavvy is on a distinguished road
Terminal session spewing nonsense characters

I'm not sure if you can with release 8, I know you can with relese 9. In release 9 you would be able to create a holiday table by typing in "change holiday-table 1" then enter the dates and times for the holiday.

In your vector step you could use something like "goto step # if holiday in table 1"

good luck!
marketsavvy is offline   sendpm.gif Reply With Quote
Reply


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On

Similar Threads
Thread Thread Starter Forum Replies Last Post
Outcalling Schedule ibctech Technology 1 May 11th, 2006 01:23 PM
Call Pilot Cut-over: Issues with RN Schedule Meridian Systems 2 July 11th, 2005 08:21 AM
Call Pilot Reporter Download Schedule TobiasMoran Meridian Systems 1 July 9th, 2003 08:31 AM
Reporter Download Schedule TobiasMoran Meridian Systems 1 July 2nd, 2003 08:30 AM
Schedule for Next week Java_Bob Off Topic 1 April 10th, 2003 12:06 PM


All times are GMT -4. The time now is 02:52 PM.


Powered by vBulletin® Version 3.7.3
Copyright ©2000 - 2010, Jelsoft Enterprises Ltd.
Search Engine Friendly URLs by vBSEO 3.2.0
Copyright (c) www.pbxinfo.com - PBX Info | Free PBX, PABX, IP PBX, VOIP and Telephone Information Resource Forum - Avaya / Nortel, Cisco, Panasonic, Mitel, ShoreTel, more...