PBX Info :: Your Free PBX, PABX and Telephone Information Resource - View Single Post - Nortel CallManager Migration
View Single Post
Old 01-14-2008, 09:49 AM   #8 (permalink)
ecornwell
Junior Member

Activity Longevity
0/20 7/20
Today Posts
0/0 ssssssss5
Rep Power: 0ecornwell is an unknown quantity at this point
Country:
Quote:
Originally Posted by WhereWolf View Post
I don't think that you need to "De-install" callpilot manager from the actual CP server. I belive that you just install CP Manager (The CP Reporter is installed at the same time as an option to CP Manager) on a stand alone web server. (You'll need the latest NTP's for CP - there are security settings that need to be set on the stand-alone web server prior to trying to login through it the first time. - Some of the slightly older NTP versions have incorrect or missing info.)
By the way - I've never been able to get Reporter to work - and I haven't figured out why. But I'll keep trying when I get a chance. There's something in the Reporter installation guide in the reporter NTP that talks about it being on the same network segment - no firewall inbetween.

Good Luck

Wherewolf
Hello,

I have been trying to get CallPilot Manager for CallPilot Ver 4.0 installed on a standalone webserver for a couple days. You mentioned that there are some security settings that need to be change and that the latest NTP's are needed. I'm very new into the Nortel World so I'm not sure where to get those. Our end goal is to get the Reporter installed.

I can bring up the CallPilot Manager interface, but when I try to login, I get a failed attempt but if you check the CP Server, it shows no failures.

Thanks,
Eric
ecornwell is offline   sendpm.gif Reply With Quote