| Those pictures bring back some memories (and the previous comments too). As an electronics design engineer I had the job of installing my initial prototype boards into an exchange building (BT) and the amount of empty floorspace was amazing. They were adding offices to the front of the building whilst I was there in the space which the switch had previously taken up. |